Working on behalf of the Sir Robert McAlpine group on their £30 million redevelopment of “The Gates” Shopping centre in Durham.
Preformed brick-slip system
Date July 2018
Gun-point NE team were on site for 4 weeks, pointing the newly attached brick slips to the external of the building. The Durham site have two colours needed on the relevant brick.